Gas-engine cogeneration, 400 kW – 4.5 MW

On-site power and heat, sized to run continuously.

We build turnkey CHP modules on European-manufactured gas engines — from a single 400 kW unit to multi-engine plants above 100 MW. Full engineering integration, over 90% combined efficiency, and commissioning in as little as 12 days.

400 kW–4.5 MWper module
>90%electrical + thermal efficiency
12 daysinstall, no welding

Electrical output by engine configuration

400 600 1000 1600 2000 2300 3000 3600 4080 4.5k kW electrical output, indicative by build

8 to 20-cylinder engine platforms cover this full range; multiple units combine for plants of 100 MW and above.

New: data center cooling

Oil-free R290 industrial chillers for data centers

Centrifugal turbocompressors on gas-dynamic bearings, 290 kW to 3.5 MW per platform, COP 9.32 at full load*.

Explore the chillers

* Calculated at SST 30 °C / SDT 45 °C.

Oil-free R290 industrial chiller
Module range

One engine platform, sized to the load.

Every module is built around a proven gas-engine core with a European manufacturing pedigree, configured for the fuel you actually have on site.

Product range

  • Electrical output from 400 kW to 4,500 kW per module
  • Configurable into power plants above 100 MW total capacity
  • 50 Hz and 60 Hz builds available across the range
  • 8, 12, 16 and 20-cylinder platforms

Key characteristics

  • Over 90% combined electrical and thermal efficiency
  • Low operating and service costs
  • High reliability and equipment availability

Fuel gas types supported

  • Natural gas
  • Shale gas, coal gas
  • Biogas, landfill gas, sewage gas
  • Synthesis gas, flare gas and associated petroleum gas (APG)

Turnkey scope

  • Gas engine, generator and fuel system
  • Exhaust routing, cooling and lubrication systems
  • Automated control cabinet with grid synchronization
  • Automatic oil top-up and ventilation systems
Add-on packages

Built out to whatever the site needs.

Beyond the base module, we scope and supply the balance of plant so a single order covers commissioning end to end.

  • Individual heat substation
  • Complete transformer substation
  • Gas conditioning equipment
  • Waste-heat recovery boiler

SCR emissions option

Modules can be fitted with Selective Catalytic Reduction (SCR), reducing NOx output to below 100 mg/m³ — meeting the strictest environmental permitting requirements without a change to footprint or install time.

The module

One enclosure, fully self-contained.

Containerized CHP module with exhaust heat recovery skid
Factory-assembled module with heat-recovery skid
16-cylinder gas engine core
Multi-cylinder gas engine core
Single container CHP module layout, engineering render
Standard single-container layout
CHP module with integrated cooling package, engineering render
Integrated cooling package
CHP module with roof-mounted cooling fans, engineering render
Roof-mounted cooling and heat recovery
Two-tier CHP module configuration for higher capacity, engineering render
Two-tier configuration for higher capacity
Why gas-engine CHP

The case against turbines, and against the grid.

Lower emissions

  • Low NOx / CO₂ output
  • No SOx or particulate emissions

Fast startup

  • 2–5 minutes to full load
  • vs. 15–40 minutes for gas turbines

Stable output

  • No derating in extreme temperatures
  • Strong performance at partial load

Economics

  • Lower maintenance cost per MWh
  • Generation cheaper than grid supply

Indicative minimum capital investment by generation technology

Gas engine Diesel Gas CCGT Solar PV Wind Hydro Coal Biomass Nuclear

Illustrative comparison only — actual capital cost per installed kW depends on site, scale and region. Gas-engine CHP consistently sits at the low end.

Engineering

Built on a European gas-engine platform, deployed as one container.

Our largest module — 4.5 MW on a 20-cylinder gas engine — pairs proven industrial reliability with a fully integrated, plug-in-ready enclosure.

  • +Proven industrial reliability, engineered to run continuously at base load
  • +Modular design for rapid deployment to site
  • +High efficiency and long service life
  • +Complete containerized package — engine, controls, cooling and heat recovery pre-integrated and factory-tested
4.3–4.5
MW
Module output range, modular execution
12
days
Typical installation time, with no on-site welding required
40%
Of components manufactured in-house, shortening lead times
100+
MW
Combined plant capacity achievable across multiple modules
Get in touch

Tell us the load, we'll size the module.

Send us your power and heat requirement, available fuel gas, and site location — we'll come back with a module configuration and budget indication.

Sales contact

WhatsApp

Telegram

Thanks — your inquiry details are ready. Connect this form to your inbox to receive them automatically.
CHP Energy Assistant ● Online